763b9308fa13c8c9c3b9a715f4daf8eba497b935 |
|
03-Aug-2011 |
RoboErik <epastern@google.com> |
b/5111195 Phone pixel perfects -dropdown spacing fixed -all day in monthview fixed -monthview month numbers moved up -allday text removed, hours now 20dips spacing on side -week days spacing fixed -only today's date is bolded -current time line spacing fixed -Agenda font colors fixed -agenda margins fixed -scrollfade removed -dayview event text margins fixed -event rectangle margins fixed -eventinfo margins fixed Change-Id: Ic9ea83af49221e2f9b4e03ad9731f2387f2f07e9
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
e9cd8f4513c141ca486bbd141f0fe34bb3c27f3a |
|
02-Jul-2011 |
RoboErik <epastern@google.com> |
Another big pass on colors and spacing This adds color treatment for current and past time and sorts out colors and spacing for day and week view. It also makes some tweaks to month view and mini-month view. Mini-month visuals are still in progress and the current home time needs to find a better location (and doesn't exist on the phone atm). Change-Id: I353e9bf63e4ea6ebf094ed544f4b0a9491c1e238
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
68655b5af2b7e5f872a103858ec58a19042123ce |
|
23-Feb-2011 |
RoboErik <epastern@google.com> |
Make column sorting for allday events handle 24h events The column sorting code assumed allday events could be sorted by start and end millis. With 24 hour events being drawn as allday events this was no longer a true assumption. This adds code for sorting these events correctly along with allday events. Change-Id: I254f495e92e6422bdb7b9ba62e2db17c8057088b
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
d031419da7900dab91ac9f512374d7e59bb74dce |
|
01-Feb-2011 |
Erik <epastern@google.com> |
b/1896074 Make events longer than 24 hours allDay This makes long events appear in the allDay area of Day/Week view. Change-Id: Ic79bc15fbccf56ad4d6c3ededd3774cfb89ee7e4
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
d190418220467c02327dd9b3ae1eae238889720b |
|
27-Jul-2010 |
Michael Chan <mchan@android.com> |
Rename CalendarView to DayView Change-Id: I853131757d57fd1144a193d85c203c5f6aadab1f
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
25251192d80159d4cf0934f3ac5c84cb0b8b7365 |
|
13-Jul-2010 |
Erik <roboerik@android.com> |
Initial work on making mini month view This creates a separate view for the mini month and interfaces out the overlapping methods between mini month and full month. The interface may become an abstract class if the code ends up being identical in both. This also removes some unused code and makes required methods public. Change-Id: Ibbad34beed9820e9c34a13dacdbf545ab6a8d301
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
1b57aa6488359a09a8ff280468a3629be2490000 |
|
08-Jan-2010 |
Erik <roboerik@android.com> |
b/2293263 Finished removing busybits references.
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
146de36083f6ce8b7e8a1f974d3990594a36bfec |
|
04-Mar-2009 |
The Android Open Source Project <initial-contribution@android.com> |
auto import from //depot/cupcake/@135843
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
2cb8df4a54d65554c34faa79d8b2a46a86ff7b52 |
|
04-Mar-2009 |
The Android Open Source Project <initial-contribution@android.com> |
auto import from //depot/cupcake/@135843
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|
a390cbfd25a5f3b2f002df725b7580bc78bd9edf |
|
21-Oct-2008 |
The Android Open Source Project <initial-contribution@android.com> |
Initial Contribution
/packages/apps/Calendar/src/com/android/calendar/EventGeometry.java
|